Sign In | Join Free | My frbiz.com |
|
Brand Name : TORICH
Model Number : SAE J526
Certification : ISO9001
Place of Origin : Zhejiang, China (Mainland)
MOQ : 5Tons
Price : USD1000-1500
Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability : 3000 Tons per Month
Delivery Time : 45-50 work days
Packaging Details : Packing: antirust protection, In hexagon bundles, in wooden box
Key words : Single Wall Bundy Tube
Material : BHG1, SPCC, SPCD, SPCEN, ST14, ST15, ST16, DC04, DC05, DC06
OD : 4-9.52mm
WT : 0.5-1m
Usage : For Refrigerator
Coating : Copper/Zinc/PVF/Military Green Zinc/GALFAN/Nylon
Length : 180Kg/coil
1. Standard
SAE J526 Welded low-carbon tubing
EN10305-6 Welded cold drawn tubes from hydraulic and pneumatic power systems
ASTM A254 Copper-brazed steel tubing
2. Steel Grade
BHG1, SPCC, SPCD, SPCEN, ST14, ST15, ST16, DC04, DC05, DC06
3. Heat Treatment
BK or NBK
4. Specification
O D/ mm | 4 | 4.2 | 4.76 | 6 | 6.35 | 7.8 | 8 | 9.52 |
W T | 0.5-1.0mm (0.5-0.7mm common WT) | |||||||
Tolerance | ±0.05mm | |||||||
Length | 180Kg/coil; 700-1000m/coil; per customer’s request |
5. Production Process
Tube welding– Cold drawing (reduce diameter)– Annealing in Protected Atmosphere— Cleaning-- Leakage detection– Zinc/Copper Plating– Keep pressure (Airtightness) – Packing
6. Surface Treatment
Coating | Thickness | Salt spray test duration |
Copper/White Zinc/Colour-Zinc | 8μm | 72h |
PVF | 8μm+20μm | 1000-2000h |
Military Green Zinc | 8μm | 180h |
GALFAN | 8μm+20μm | 1000-2000h |
Nylon | 8μm+40μm | 180h |
7. Packing: In coil, in wooden box with seaworthy packing
8. Application
1) Fluid carrying system for automobiles
2) Fluid carrying system for refrigerators
3) Wire condenser for chillers, showcase
4) Vending machine, ice machine etc.
Detailed Images
1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.
A&Q
A: A professional steel pipes materials inventor, manufacturer and solution provider
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample but need pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us
![]() |
Brake System Welded Steel Tube Single Wall Bundy Tube For Refrigerator Images |